Sign In | Join Free | My ledscreensign.com
China SuZhou Saneco boiler co.ltd logo
SuZhou Saneco boiler co.ltd
The service and quality today will be the customer and credit tomorrow.
Verified Supplier

2 Years

Home > Boiler Economizer >

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification

SuZhou Saneco boiler co.ltd
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification

Place of Origin : Zhangjiagang,China

Brand Name : HD Boiler

Certification : ISO9001,ASME,Grade A,SGS,EN,TUV

Model Number : Economizer

MOQ : 800 tons

Price : $30 / ton

Type : Natural Circulation

Structure : fire tube and water tube

Pressure : Low / High Pressure

Style : VERTICAL

Fuel : Coal / Gas / Coal-fired / Water Heat

Output : Hot Water / Steam

Weight : 20000 KG

Surface Treatment : Painted

Bare pipe OD : 25-1650 mm

Bare pipe Thickness : 2-40 mm

Fin Thickness : 0.6-3.0 mm

Fin Height : 5-30 mm

Fin tube pitch : 5-30 mm

Fin tube length : ≤12000 mm

Material : Carbon Steel, Alloy, Austenitic Steel

Contact Now

Boiler Economizer

Power Station CFB Steam Boiler Economizer Central Heating ASTM Certification

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification

Product Description

Product Description

Economizer is a mechanical device intended to reduce energy consumption, or to perform another useful function like preheating a fluid. The economizer is used for other purposes as well boiler, power plant, and heating, ventilating, and air-condition in(HVAC) uses are discussed in this article. In simple terms, an economizer is a heat exchanger.

Function

The function of the economizer is as its name implies, to “economize” or save on cooling costs. Obviously, it costs money to operate the compressor. If the compressor can be shut down and the system still provide adequate cooling, energy savings can be realized.

Specifications

Name(unit)

Specification(mm)

Bare pipe(OD)

25-1650

Bare pipe(Thickness)

2-40

Fin (Thickness)

0.6-3.0

Fin (Height)

5-30

Fin tube thread pitch

5-30

Fin tube length

≤12000

Material:Carbon Steel,Alloy,Austenitic Steel(Nickel and Chromium or Manganese)

Quality Control

1. Impact test and Strength calculation report with applied materials information.

2. 100%NDT(non-destructive inspection) report of steel plate, tube and electrode

3. X-ray, γ-ray and liquid penetrant test inspection report (welding seam): to ensure the quality of the entire boiler

4. Hydraulic test report: ensure the standard working pressure and safety

Similar Products

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification

Company Information

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification

Packaging & Shipping

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification

FAQ

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification


Product Tags:

Power Station CFB Boiler Economizer

      

Central Heating Boiler Economizer

      

1 Year Warranty Boiler Economizer

      
Quality Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification for sale

Power Station CFB Boiler Economizer with Central Heating and 1 Year Warranty ASTM Certification Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: SuZhou Saneco boiler co.ltd
*Subject:
*Message:
Characters Remaining: (0/3000)